1943–1989 · Foundations
Morris Chang invents the pure-play foundry: manufacture for everyone, compete with no one.
1990–2011 · The long ramp
Jensen Huang, Chris Malachowsky and Curtis Priem start a graphics-chip company at a Denny's.
2012–2016 · Deep learning works
Altman, Musk, Sutskever, Brockman and others launch a nonprofit lab with $1B pledged.
2017–2019 · Transformers
The partnership that will define the commercial era; Azure becomes OpenAI's exclusive cloud.
2020–2022 · Scaling
The first mass-market LLM product: code completion from Codex.
A 'research preview' reaches 100M users in two months: the fastest product adoption ever recorded, and the starting gun for everything in this database's Trends section.
2023–present · The build-out
The first chipmaker to a $1T market value, on data-center guidance that stuns Wall Street.
OpenAI's board crisis ends with Altman back and the board remade: governance meets capability in public.
Memphis build resets industry assumptions about how fast a frontier cluster can rise.
Constellation and Microsoft sign a 20-year, 835 MW PPA: AI money starts reversing nuclear retirements.
OpenAI, SoftBank, Oracle and MGX unveil an up-to-$500B US buildout; Abilene is site one.
The GPU cloud lists at ~$23B: the market's first pure-play AI infrastructure stock.
$14.3B for 49% of Scale and a hiring spree with nine-figure packages.
First company to the mark: ahead of every national stock market but a handful.
The NRC moves the shut Michigan plant back to an operating license, a first in US history; fuel loading for the restart begins a year later.
Circular or catalytic? The vendor-financing debate defines the autumn.
MI450 anchors OpenAI's second silicon supplier; equity warrants align them.
Google Cloud deal worth tens of billions; a gigawatt of TPU capacity slated for 2026.
Agreements with Vistra, TerraPower and Oklo could support up to 6.6 GW by 2035, mixing uprates with new advanced reactors (reported).
An all-stock deal effective February 2 folds xAI, and with it X and Grok, into SpaceX (reported).
Meta signs for up to 6 GW of Instinct GPUs, starting with a custom MI450-based part in Helios racks, with warrants for up to 160M AMD shares.
The enlarged round closes as the largest private financing on record, with about $3B from individual investors (reported).
After OpenAI drops the expansion, Crusoe announces a 900 MW campus beside Stargate Abilene for Microsoft, taking the site to a projected 2.1 GW.
TerraPower receives the first construction permit for a commercial non-light-water reactor, Kemmerer Unit 1 in Wyoming; full construction begins in April.
A multi-gigawatt Google and Broadcom TPU deal from 2027 is followed two weeks later by an AWS agreement for up to 5 GW and over $100B of spending.
Azure stays OpenAI's primary cloud, but OpenAI may sell on any cloud and Microsoft's IP license becomes non-exclusive through 2032.
The Series H values Anthropic above OpenAI's March round; the company cites run-rate revenue above $47B.
Anthropic agrees to use all compute at Colossus 1, more than 300 MW and over 220,000 NVIDIA GPUs.
Anthropic (June 1) and OpenAI (June 8) both submit draft S-1s to the SEC without setting listing dates.
FERC lets Constellation transfer 760 MW of capacity interconnection rights from Eddystone to Crane, keeping a 2027 restart possible.
Microsoft says its first Mount Pleasant facility is complete and fully operational, with a second due in 2028.
Meta says Hyperion will reach 5 GW of compute capacity with more than $50B invested, about 2 GW by 2030.
Anthropic plans up to 2 GW of MI455X GPUs in Helios racks from the first half of 2027; AMD commits up to $5B in equity.
Holtec starts the first core load for the restart; a tilted fuel assembly pauses the work until October, ahead of a contracted March 2027 power date.
The loan backs NextEra's restart of the 615 MW Iowa plant, whose output Google will buy under a 25-year agreement.
Oracle says 618 MW, 75% of Abilene's capacity, has been delivered to OpenAI, with 131,000 GPUs added in the quarter.
Meta says the first phase of its gigawatt-scale Prometheus cluster is complete, with hundreds of thousands of GPUs, and trained its Muse models.
A 20-year agreement with Constellation supports uprates at 11 reactors in PJM, the first due online in 2028 (reported).
AMD's Q3 2026 Data Center revenue reaches $8.5B, up 97%, as MI455X ships in volume and five lead customers bring Helios racks online.
Co-founder Jensen Huang resigns as NVIDIA's President, CEO and director, effective immediately, with no reason given; CFO Colette Kress becomes interim CEO and Harvey C. Jones the first Chair of the Board.