AI Infrastructure DatabaseThe chips, power and companies behind AI
Saved
Menu
Home How It's Built Watchlist The Stack
Hardware ChipsCompare Chips Servers & SystemsNetworking MemoryFoundries & Packaging Cooling
Facilities Data CentersPower ProjectsCloud & GPU Compute
Intelligence AI ModelsSoftware AI ProductsBenchmarks Research PapersDatasets Concepts
Ecosystem CompaniesStocks PeopleTimeline TrendsFuture of AI
Learn News Ask the Data AI Agents
About About us Methodology Data & API Disclaimer
Options
DATA & API

Free read-only JSON access to the site's cached data.

Dark mode

Guided View
New to chips, data centers and model jargon? We explain key terms as you browse, in plain English. Same data, with the help built in.

Expert View
You already know the stack. Just the data: clean, fast and compact, with no extra explanations. This is the default view.

Interface language
‹ Back
Home › Power Projects › Palisades Nuclear Plant

Palisades Nuclear Plant

Power Project Nuclear Restart Restart under way; fuel loading Covert Township, Michigan, US

The first US reactor licensed back from decommissioning, still working toward power.

You're looking at a power record: a real power plant or energy deal, who owns it and which AI buyer it feeds.

Holtec bought Palisades (800 MW), shut in May 2022, to decommission it, then pursued a restart with Michigan support and a $1.52B DOE loan guarantee. In July 2025 the NRC approved the licensing actions returning it to operational status, the first for a US plant in decommissioning. The restart, first aimed at late 2025, has slipped: fuel loading began 30 August 2026 but paused when an assembly tilted in the core; Holtec recovered it in October 2026 and resumed loading. The plant is contracted to supply power from March 2027, and Holtec has not published a firm restart date.

Specifications & key facts

Each figure is labeled by basis: vendor spec, vendor claim, reported, estimate, or official. "Not publicly disclosed" means exactly that: we never invent values.

Overview

Owner Holtec InternationalOfficial
Capacity 800 MWOfficial
Shutdown May 2022 (defueled June 2022)Reported Nuclear Engineering International, Oct 2026
Financing $1.52B DOE loan guarantee (finalised Sep 2024) + state supportOfficial

Regulatory

NRC return to operations Licensing actions approved 24 Jul 2025; plant formally transitioned to operational status 25 Aug 2025Official NRC release 25-046; Holtec, Aug 2025
NRC inspection finding Chilled work environment found in supply chain and QA departments (Oct 2026)Reported ANS, Oct 2026

Schedule

Fuel loading Began 30 Aug 2026; paused after a fuel assembly tilted; assembly recovered with NRC-approved method and loading resumed (21 Oct 2026)Official Holtec release, 21 Oct 2026; ANS, Sep 2026
Restart target Contracted to supply power by March 2027; no firm date publishedReported Nuclear Engineering International, 26 Oct 2026

Grid

Switchyard Reconnected to 345 kV switchyard 11 Sep 2026Reported ANS Nuclear Newswire, 25 Sep 2026

How this connects to the rest of the stack

Owned by · 1 Related · 1 Palisades Nuclear Plant

This record's links at a glance: click a group to jump to it.

Related

Sources

Holtec: tilted fuel assembly recovered at Palisades (Oct 2026) ↗ · NEI Magazine: Palisades resolves fuel assembly setback (Oct 2026) ↗ · ANS: Incident pauses Palisades fuel loading (Sep 2026) ↗ · ANS: Palisades gets a key green light from NRC (Jul 2025) ↗ · Holtec Palisades ↗

Record reviewed as of 2026-11-16; see Methodology.