AI Infrastructure DatabaseThe chips, power and companies behind AI
Saved
Menu
Home How It's Built Watchlist The Stack
Hardware ChipsCompare Chips Servers & SystemsNetworking MemoryFoundries & Packaging Cooling
Facilities Data CentersPower ProjectsCloud & GPU Compute
Intelligence AI ModelsSoftware AI ProductsBenchmarks Research PapersDatasets Concepts
Ecosystem CompaniesStocks PeopleTimeline TrendsFuture of AI
Learn News Ask the Data AI Agents
About About us Methodology Data & API Disclaimer
Options
DATA & API

Free read-only JSON access to the site's cached data.

Dark mode

Guided View
New to chips, data centers and model jargon? We explain key terms as you browse, in plain English. Same data, with the help built in.

Expert View
You already know the stack. Just the data: clean, fast and compact, with no extra explanations. This is the default view.

Interface language
‹ Back
Home › Data Centers › Stargate Abilene

Stargate Abilene

Data Center AI Campus Operating; final buildings commissioning Abilene, Texas, US

The flagship of the Stargate program: eight buildings, about 1.2 GW, built for OpenAI by Crusoe and Oracle.

You're looking at a data-center record: a real facility, who runs it, what hardware fills it, and where its power comes from.

Announced at the White House in January 2025, Stargate is the OpenAI, SoftBank, Oracle and MGX program to build AI infrastructure in the US at a stated scale of up to $500B. Its first campus, developed by Crusoe on a Lancium site in Abilene, Texas, comprises eight buildings of about 1.2 GW that Oracle operates for OpenAI. The first GB200 racks arrived in June 2025; in September 2026 Oracle said six buildings, 618 MW, had been delivered. In March 2026 OpenAI dropped plans to expand the site, and Crusoe signed an adjacent 900 MW campus with Microsoft instead.

Specifications & key facts

Each figure is labeled by basis: vendor spec, vendor claim, reported, estimate, or official. "Not publicly disclosed" means exactly that: we never invent values.

Overview

Program Stargate: OpenAI, SoftBank, Oracle, MGXOfficial
Developer / builder Crusoe (JV with Blue Owl, Primary Digital)Reported
Announced January 2025 (program); site works began 2024
Adjacent expansion 900 MW Microsoft campus by Crusoe (2 buildings, on-site power); whole site projected at 2.1 GW, 10 buildingsOfficial Crusoe, 27 Mar 2026; first Microsoft building reported due to energize mid-2027

Scale

Target capacity ~1.2 GW, 8 buildingsReported Total facility power; Oracle's delivered figures are a share of IT capacity
Delivered 6 of 8 buildings, 618 MW (75% of capacity)Official Oracle Q1 FY2027 earnings call, 10 Sep 2026; no date given for the last two
GPUs delivered in quarter 131,000 (Jun–Aug 2026)Official Oracle Q1 FY2027 earnings call, 10 Sep 2026
Hardware NVIDIA GB200 NVL72 racks; hundreds of thousands of GPUs at build-outReported

Power

Supply ERCOT grid via Oncor + on-site gas generationReported
On-site generation ~350 MW gas plant (backup, per Oracle)Reported AP, 27 Mar 2026

Cooling

Cooling Closed-loop direct liquid coolingReported

How this connects to the rest of the stack

This record's links at a glance: click a group to jump to it.

Operated by

Built by

Anchor tenant

Electricity supplied by

Supplied by

Sources

Oracle Q1 FY2027 earnings call transcript (Sep 2026) ↗ · Crusoe: 900 MW Abilene campus for Microsoft (Mar 2026) ↗ · AP: Microsoft takes over Abilene expansion after OpenAI backs away ↗ · Epoch AI: Stargate Abilene (estimates) ↗ · OpenAI Stargate announcement ↗