Kemmerer Unit 1 is TerraPower's first Natrium plant: a 345 MW sodium-cooled fast reactor with molten-salt storage that can flex to 500 MW, sited beside a retiring coal plant to reuse its grid connection and workforce. Non-nuclear work began in June 2024. On 4 March 2026 the NRC voted to grant the first construction permit for a commercial non-light-water reactor, after an 18-month review, and TerraPower started full construction on 23 April 2026 with Bechtel as EPC contractor. Completion is expected in 2030; a separate operating license is still required. In January 2026 Meta agreed to fund two further Natrium units elsewhere.
Specifications & key facts
Each figure is labeled by basis: vendor spec, vendor claim, reported, estimate, or official. "Not publicly disclosed" means exactly that: we never invent values.
Overview
Regulatory
Schedule
Related deal
How this connects to the rest of the stack
This record's links at a glance: click a group to jump to it.
Owned by
Sources
TerraPower: construction begins on Kemmerer Unit 1 (Apr 2026) ↗ · TerraPower: NRC approves Natrium construction permit (Mar 2026) ↗ · WNN: Meta announces agreements for new nuclear (Jan 2026) ↗ · TerraPower Natrium ↗
Record reviewed as of 2026-11-16; see Methodology.