Construction is the honest scoreboard of the AI race: announcements are cheap, but concrete, turbines and interconnection agreements are not. Every record here lists reported capacity with its basis: read the labels, not just the gigawatts.
Start with these three
SA
Stargate Abilene
The program that made 'half a trillion dollars' a normal sentence.
MH
Meta Hyperion
A campus compared to Manhattan, in rural Louisiana.
AN
AWS New Carlisle (Project Rainier)
Anthropic's training ground: the largest non-NVIDIA build on Earth.
AI campuses & programs
16
SA
Stargate Abilene
The flagship of the Stargate program: eight buildings, about 1.2 GW, built for OpenAI by Crusoe and Oracle.
XC
xAI Colossus
100,000 GPUs in 122 days: the build that reset the industry's clock.
AN
AWS New Carlisle (Project Rainier)
Anthropic's training ground: a Trainium2 mega-campus in the Indiana corn belt.
MH
Meta Hyperion
A campus the size of Manhattan: 5 GW and $50B+ in rural Louisiana.
MF
Microsoft Fairwater
Microsoft's 'most powerful AI datacenter', and a template it is replicating.
MF
Microsoft Fairwater Atlanta
The first Fairwater to switch on, and the second node of Microsoft's AI superfactory.
SU
Stargate US sites
Six campuses beyond Abilene meant to carry Stargate toward 7 GW.
EC
El Capitan (LLNL)
The fastest disclosed computer on Earth: MI300A APUs for the nuclear stockpile.
EA
Equinix Ashburn (Data Center Alley)
The most connected place on the internet: where AI meets the network.
Frontier (Oak Ridge)
The first exascale computer: public-sector proof of AMD's stack.
Google Council Bluffs
A window into Google's fleet: two decades and $5B+ in one Iowa town.
MP
Meta Prometheus
Meta's first gigawatt-class cluster, first phase complete in 2026.
SU
Stargate UAE
The 5 GW Gulf out-station of the Stargate program.
SC
Switch Citadel Campus
One of the world's largest planned colocation campuses, and Oklo's first customer site region.
TC
Tesla Cortex
The GPU cluster at Giga Texas training Full Self-Driving.
XC
xAI Colossus 2
The gigawatt sequel: xAI's second Memphis campus, powered from across the Mississippi line.
Frontier (Oak Ridge)
The first exascale computer: public-sector proof of AMD's stack.
Google Council Bluffs
A window into Google's fleet: two decades and $5B+ in one Iowa town.
MP
Meta Prometheus
Meta's first gigawatt-class cluster, first phase complete in 2026.
SU
Stargate UAE
The 5 GW Gulf out-station of the Stargate program.
SC
Switch Citadel Campus
One of the world's largest planned colocation campuses, and Oklo's first customer site region.
TC
Tesla Cortex
The GPU cluster at Giga Texas training Full Self-Driving.
XC
xAI Colossus 2
The gigawatt sequel: xAI's second Memphis campus, powered from across the Mississippi line.
Power projects tied to AI demand
10
Crane Clean Energy Center (Three Mile Island Unit 1)
The restart that defined AI's nuclear turn: 835 MW, all of it for Microsoft.
PN
Palisades Nuclear Plant
The first US reactor licensed back from decommissioning, still working toward power.
Clinton Clean Energy Center
Meta's 20-year deal that saved an Illinois reactor.
Diablo Canyon
California's last reactors, extended for the AI decade.
Duane Arnold Energy Center
Iowa's shut reactor, restarting for Google around early 2029.
Homer City Energy Campus
A demolished coal giant rebuilt as a 4.4 GW gas plant for an AI campus.
KH
Kairos Hermes / Google Fleet
The first Gen IV construction permits in the US; and Google's 500 MW order.
Susquehanna Steam Electric Station
The reactor with a data center at the fence line: AWS's landmark arrangement.
TN
TerraPower Natrium (Kemmerer)
The most advanced new-reactor site in America, on a retiring coal town.
Vogtle Units 3 & 4
America's newest reactors: the hard-won template for building big again.