Every facility here answers the same three questions differently: where does the power come from, how is the heat removed, and who is the anchor tenant? Read two or three records and you'll start guessing the answers before you click, that's the point.
Start with these three
SA
Stargate Abilene
The flagship build of the era: eight buildings, on-site turbines, OpenAI inside.
XC
xAI Colossus
100,000 GPUs in 122 days. The speed record every builder now chases.
MF
Microsoft Fairwater
The template: closed-loop cooling, GB200 fleets, now being replicated city by city.
Hyperscale & AI campuses
11
SA
Stargate Abilene
The flagship of the Stargate program: eight buildings, about 1.2 GW, built for OpenAI by Crusoe and Oracle.
XC
xAI Colossus
100,000 GPUs in 122 days: the build that reset the industry's clock.
AN
AWS New Carlisle (Project Rainier)
Anthropic's training ground: a Trainium2 mega-campus in the Indiana corn belt.
MH
Meta Hyperion
A campus the size of Manhattan: 5 GW and $50B+ in rural Louisiana.
MF
Microsoft Fairwater
Microsoft's 'most powerful AI datacenter', and a template it is replicating.
MF
Microsoft Fairwater Atlanta
The first Fairwater to switch on, and the second node of Microsoft's AI superfactory.
SU
Stargate US sites
Six campuses beyond Abilene meant to carry Stargate toward 7 GW.
MP
Meta Prometheus
Meta's first gigawatt-class cluster, first phase complete in 2026.
SU
Stargate UAE
The 5 GW Gulf out-station of the Stargate program.
TC
Tesla Cortex
The GPU cluster at Giga Texas training Full Self-Driving.
XC
xAI Colossus 2
The gigawatt sequel: xAI's second Memphis campus, powered from across the Mississippi line.
Colocation & wholesale
2
EA
Equinix Ashburn (Data Center Alley)
The most connected place on the internet: where AI meets the network.
SC
Switch Citadel Campus
One of the world's largest planned colocation campuses, and Oklo's first customer site region.