Meta Prometheus
Meta's first gigawatt-class cluster, first phase complete in 2026.
You're looking at a data-center record: a real facility, who runs it, what hardware fills it, and where its power comes from.
Prometheus is Meta's first gigawatt-scale AI training cluster, at New Albany, Ohio. It combines conventional and AI-optimized buildings with rapid-deployment tent structures, GB200 and GB300 racks, and on-site gas generation alongside AEP Ohio supply. In October 2026 Meta said the first phase was complete, with hundreds of thousands of GPUs, and that it had trained the Muse family of models; it targets roughly one million GPUs at full scale. Epoch AI estimates about 471 MW of IT power was operating by August 2026.
Specifications & key facts
Each figure is labeled by basis: vendor spec, vendor claim, reported, estimate, or official. "Not publicly disclosed" means exactly that: we never invent values.
Overview
Scale
Power
How this connects to the rest of the stack
This record's links at a glance: click a group to jump to it.
Cooling
Contains
Operated by
Electricity supplied by
Related
Sources
Engineering at Meta: Inside Prometheus (Oct 2026) ↗ · Epoch AI: Meta Prometheus (estimates) ↗ · Ohio PUC case 25-0188-EL-BGN ↗
Record reviewed as of 2026-11-16; see Methodology.