AI Infrastructure DatabaseThe chips, power and companies behind AI
Saved
Menu
Home How It's Built Watchlist The Stack
Hardware ChipsCompare Chips Servers & SystemsNetworking MemoryFoundries & Packaging Cooling
Facilities Data CentersPower ProjectsCloud & GPU Compute
Intelligence AI ModelsSoftware AI ProductsBenchmarks Research PapersDatasets Concepts
Ecosystem CompaniesStocks PeopleTimeline TrendsFuture of AI
Learn News Ask the Data AI Agents
About About us Methodology Data & API Disclaimer
Options
DATA & API

Free read-only JSON access to the site's cached data.

Dark mode

Guided View
New to chips, data centers and model jargon? We explain key terms as you browse, in plain English. Same data, with the help built in.

Expert View
You already know the stack. Just the data: clean, fast and compact, with no extra explanations. This is the default view.

Interface language
‹ Back
Home › Data Centers › Meta Prometheus

Meta Prometheus

Data Center AI Campus Operating; expanding New Albany, Ohio, US

Meta's first gigawatt-class cluster, first phase complete in 2026.

You're looking at a data-center record: a real facility, who runs it, what hardware fills it, and where its power comes from.

Prometheus is Meta's first gigawatt-scale AI training cluster, at New Albany, Ohio. It combines conventional and AI-optimized buildings with rapid-deployment tent structures, GB200 and GB300 racks, and on-site gas generation alongside AEP Ohio supply. In October 2026 Meta said the first phase was complete, with hundreds of thousands of GPUs, and that it had trained the Muse family of models; it targets roughly one million GPUs at full scale. Epoch AI estimates about 471 MW of IT power was operating by August 2026.

Specifications & key facts

Each figure is labeled by basis: vendor spec, vendor claim, reported, estimate, or official. "Not publicly disclosed" means exactly that: we never invent values.

Overview

Operator Meta
Models trained Muse family (incl. Muse Wonder)Official
Method Mix of conventional, AI-optimized and rapid-deployment (tent) buildings; air-assisted and facility liquid coolingOfficial

Scale

Capacity ~1 GW class (company statements)Vendor claim
GPUs Hundreds of thousands (Oct 2026); ~1M at full scaleVendor claim Engineering at Meta, 19 Oct 2026
Estimated IT power 471 MWEstimate Epoch AI, as of 31 Aug 2026; Epoch projects ~1 GW by Q3 2028
Hardware GB200 (Catalina) and GB300 (Clemente) racks; Vera Rubin nextOfficial Engineering at Meta, 19 Oct 2026

Power

On-site generation Socrates South and North gas plants; ~139 MW running at Socrates South, North not yet running (Aug 2026)Estimate Epoch AI from drone imagery, Aug 2026; Ohio PUC case 25-0188-EL-BGN

How this connects to the rest of the stack

This record's links at a glance: click a group to jump to it.

Operated by

Electricity supplied by

Related

Sources

Engineering at Meta: Inside Prometheus (Oct 2026) ↗ · Epoch AI: Meta Prometheus (estimates) ↗ · Ohio PUC case 25-0188-EL-BGN ↗

Record reviewed as of 2026-11-16; see Methodology.