Microsoft Fairwater Atlanta
The first Fairwater to switch on, and the second node of Microsoft's AI superfactory.
You're looking at a data-center record: a real facility, who runs it, what hardware fills it, and where its power comes from.
Fairwater Atlanta is the second site in Microsoft's Fairwater family and the first to enter service, beginning operation in October 2025. It uses the same design as the Wisconsin site in a two-story building, with NVIDIA GB200 NVL72 racks and closed-loop liquid cooling. A dedicated AI WAN links it to Wisconsin so the sites can work as one 'AI superfactory'. Epoch AI places it in Fayetteville, Georgia, built by QTS, and estimates about 636 MW of IT power was operating by June 2026.
Specifications & key facts
Each figure is labeled by basis: vendor spec, vendor claim, reported, estimate, or official. "Not publicly disclosed" means exactly that: we never invent values.
Overview
Scale
Cooling
How this connects to the rest of the stack
This record's links at a glance: click a group to jump to it.
Cooling
Contains
Operated by
Built by
Related
Sources
Microsoft: AI superfactory, Wisconsin to Atlanta (Nov 2025) ↗ · Epoch AI: Fairwater Atlanta (estimates) ↗
Record reviewed as of 2026-11-16; see Methodology.