Susquehanna Steam Electric Station
The reactor with a data center at the fence line: AWS's landmark arrangement.
You're looking at a power record: a real power plant or energy deal, who owns it and which AI buyer it feeds.
Photo: Jakec · CC BY-SA 4.0 · Wikimedia Commons
Talen's 2.5 GW Susquehanna plant hosts the data campus Amazon bought in 2024, originally served behind the meter under an interconnection change FERC rejected in November 2024. In June 2025 Talen and AWS replaced it with a 17-year, ~$18B front-of-meter retail PPA for up to 1,920 MW through 2042, ramping to 840-1,200 MW by 2029 and 1,680-1,920 MW by 2032 depending on AWS's build pace. The switch from the 300 MW behind-the-meter setup was planned for the spring 2026 refueling outage. The parties are also studying uprates and small modular reactors.
Specifications & key facts
Each figure is labeled by basis: vendor spec, vendor claim, reported, estimate, or official. "Not publicly disclosed" means exactly that: we never invent values.
Overview
Schedule
How this connects to the rest of the stack
This record's links at a glance: click a group to jump to it.
Supplies electricity to
Supplier to
Owned by
Related
Sources
POWER: Talen, Amazon launch $18B nuclear PPA (Jun 2025) ↗ · Talen-AWS expansion ↗
Record reviewed as of 2026-11-16; see Methodology.