{"data":{"slug":"stargate-abilene","etype":"datacenter","name":"Stargate Abilene","cat":"AI Campus","subtitle":"The flagship of the Stargate program: eight buildings, about 1.2 GW, built for OpenAI by Crusoe and Oracle.","summary":"Announced at the White House in January 2025, Stargate is the OpenAI, SoftBank, Oracle and MGX program to build AI infrastructure in the US at a stated scale of up to $500B. Its first campus, developed by Crusoe on a Lancium site in Abilene, Texas, comprises eight buildings of about 1.2 GW that Oracle operates for OpenAI. The first GB200 racks arrived in June 2025; in September 2026 Oracle said six buildings, 618 MW, had been delivered. In March 2026 OpenAI dropped plans to expand the site, and Crusoe signed an adjacent 900 MW campus with Microsoft instead.","attrs":[{"b":"Official","g":"Overview","l":"Program","v":"Stargate: OpenAI, SoftBank, Oracle, MGX"},{"b":"Reported","g":"Overview","l":"Developer / builder","v":"Crusoe (JV with Blue Owl, Primary Digital)"},{"g":"Overview","l":"Announced","v":"January 2025 (program); site works began 2024"},{"b":"Reported","g":"Scale","l":"Target capacity","n":"Total facility power; Oracle's delivered figures are a share of IT capacity","v":"~1.2 GW, 8 buildings"},{"b":"Official","g":"Scale","l":"Delivered","n":"Oracle Q1 FY2027 earnings call, 10 Sep 2026; no date given for the last two","v":"6 of 8 buildings, 618 MW (75% of capacity)"},{"b":"Official","g":"Scale","l":"GPUs delivered in quarter","n":"Oracle Q1 FY2027 earnings call, 10 Sep 2026","v":"131,000 (Jun–Aug 2026)"},{"b":"Reported","g":"Scale","l":"Hardware","v":"NVIDIA GB200 NVL72 racks; hundreds of thousands of GPUs at build-out"},{"b":"Reported","g":"Power","l":"Supply","v":"ERCOT grid via Oncor + on-site gas generation"},{"b":"Reported","g":"Power","l":"On-site generation","n":"AP, 27 Mar 2026","v":"~350 MW gas plant (backup, per Oracle)"},{"b":"Official","g":"Overview","l":"Adjacent expansion","n":"Crusoe, 27 Mar 2026; first Microsoft building reported due to energize mid-2027","v":"900 MW Microsoft campus by Crusoe (2 buildings, on-site power); whole site projected at 2.1 GW, 10 buildings"},{"b":"Reported","g":"Cooling","l":"Cooling","v":"Closed-loop direct liquid cooling"}],"kf":{"chips":"NVIDIA GB200/GB300","power":"618 MW delivered, 75% of capacity (Oracle, Sep 2026)","status":"6 of 8 buildings delivered (Sep 2026)","operator":"Oracle (for OpenAI)"},"aliases":["Stargate","Project Ludicrous","Abilene data center"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":"Operating; final buildings commissioning","region":"Abilene, Texas, US","asof":"2026-11-16","sources":[{"url":"https://www.fool.com/earnings/call-transcripts/2026/09/11/oracle-orcl-q1-2027-earnings-call-transcript/","label":"Oracle Q1 FY2027 earnings call transcript (Sep 2026)"},{"url":"https://crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","label":"Crusoe: 900 MW Abilene campus for Microsoft (Mar 2026)"},{"url":"https://www.wsls.com/business/2026/03/27/microsoft-takes-over-a-texas-ai-data-center-expansion-after-openai-backs-away/","label":"AP: Microsoft takes over Abilene expansion after OpenAI backs away"},{"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene","label":"Epoch AI: Stargate Abilene (estimates)"},{"url":"https://openai.com/index/announcing-the-stargate-project/","label":"OpenAI Stargate announcement"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-11-29T08:17:14+00:00","disclaimer":"Research and information only, not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}