このイベントの根拠となる記録
4-
チップ
NVIDIA Rubin
The 2026 architecture: two-die GPUs with 288 GB of HBM4, paired with the Vera CPU in NVL72 racks.
Rubin is NVIDIA's 2026 data-center GPU architecture, named for astronomer Vera Rubin. Each package joins two reticle-size dies with 288 GB of HBM4, and NVIDIA's spec table rates it at 50 PFLOPS of NVFP4 inference (sparse) and 35 PFLOPS of NVFP4 training (dense). It ships mainly in Vera Rubin NVL72 racks (72 GPUs, 36 Vera CPUs), which NVIDIA briefly styled…
レコードを開く → -
システム
NVIDIA Vera Rubin NVL72
The third-generation NVLink rack: 72 Rubin GPUs and 36 Vera CPUs in the Oberon frame.
Vera Rubin NVL72 is NVIDIA's 2026 rack-scale system and the successor to GB300 NVL72. It keeps the Oberon rack layout of 72 GPU sockets and 36 CPU sockets, filled with Rubin GPUs, Vera CPUs, NVLink 6 switches, ConnectX-9 SuperNICs and BlueField-4 DPUs. NVIDIA's spec table rates the rack at 3,600 PFLOPS of NVFP4 inference (sparse) with 20.7 TB of HBM4. First…
レコードを開く → -
企業
CoreWeave
The crypto-miner turned AI hyperscaler: a $130B+ contract backlog and the first Vera Rubin cloud.
CoreWeave repurposed GPU-mining expertise into the largest AI-specialist cloud: first to market with each NVIDIA generation, debt-financed against GPU-backed contracts, and listed in March 2025 in the sector's signature IPO. Its revenue backlog grew from $66.8B at the end of 2025 to about $132.5B at September 30, 2026, helped by an expanded $21B Meta…
レコードを開く → -
企業
Oracle
The late-arriving cloud that bet the company on OpenAI, Stargate and a $664B backlog.
Oracle Cloud Infrastructure became the AI era's specialist heavy lifter, hosting xAI, Meta and above all OpenAI, whose multi-year commitments drove Oracle's remaining performance obligations to $664B at the end of August 2026. It is the operating partner at Stargate Abilene, where six of eight buildings (618 MW) had been delivered to the customer by…
レコードを開く →