{"data":{"slug":"terrapower-natrium","etype":"power","name":"TerraPower Natrium (Kemmerer)","cat":"SMR Program","subtitle":"The most advanced new-reactor site in America, on a retiring coal town.","summary":"Kemmerer Unit 1 is TerraPower's first Natrium plant: a 345 MW sodium-cooled fast reactor with molten-salt storage that can flex to 500 MW, sited beside a retiring coal plant to reuse its grid connection and workforce. Non-nuclear work began in June 2024. On 4 March 2026 the NRC voted to grant the first construction permit for a commercial non-light-water reactor, after an 18-month review, and TerraPower started full construction on 23 April 2026 with Bechtel as EPC contractor. Completion is expected in 2030; a separate operating license is still required. In January 2026 Meta agreed to fund two further Natrium units elsewhere.","attrs":[{"b":"Official","g":"Overview","l":"Developer","v":"TerraPower (founded by Bill Gates); licensee US SFR Owner"},{"b":"Official","g":"Overview","l":"Capacity","v":"345 MW base / 500 MW with storage boost"},{"b":"Official","g":"Overview","l":"Construction start","n":"TerraPower, 23 Apr 2026","v":"June 2024 (non-nuclear scope); full construction 23 Apr 2026"},{"b":"Official","g":"Overview","l":"EPC contractor","n":"TerraPower, Apr 2026","v":"Bechtel"},{"b":"Official","g":"Regulatory","l":"NRC construction permit","n":"TerraPower, Mar 2026; Federal Register 2026-05067","v":"Commission vote 4 Mar 2026; CPAR-1 issued 9 Mar 2026; review took 18 months vs 27 scheduled"},{"b":"Reported","g":"Regulatory","l":"Operating license","n":"ANS, Mar 2026","v":"Separate NRC application still required"},{"b":"Official","g":"Schedule","l":"Completion target","n":"TerraPower, Mar 2026 (DOE Advanced Reactor Demonstration Program)","v":"2030"},{"b":"Reported","g":"Related deal","l":"Meta agreement","n":"World Nuclear News, 9 Jan 2026","v":"Funds two new Natrium units (up to 690 MW, as early as 2032) plus rights to six more (2.1 GW by 2035); site to be identified"}],"kf":{"type":"Advanced reactor","status":"Nuclear construction since Apr 2026; completion 2030","capacity":"345 MW (500 MW peak)"},"aliases":["Natrium","Kemmerer reactor","Kemmerer Unit 1"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":"Under construction","region":"Kemmerer, Wyoming, US","asof":"2026-11-16","sources":[{"url":"https://www.terrapower.com/TerraPower-Commences-Construction-on-Americas-First-Utility-Scale-Advanced-Nuclear-Power-Plant","label":"TerraPower: construction begins on Kemmerer Unit 1 (Apr 2026)"},{"url":"https://www.terrapower.com/NRC-Approves-Natrium-Reactor-Construction-Permit","label":"TerraPower: NRC approves Natrium construction permit (Mar 2026)"},{"url":"https://world-nuclear-news.org/articles/meta-announces-landmark-agreements-for-new-nuclear","label":"WNN: Meta announces agreements for new nuclear (Jan 2026)"},{"url":"https://www.terrapower.com/natrium/","label":"TerraPower Natrium"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-11-28T08:03:35+00:00","disclaimer":"Research and information only, not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}