Grid Interconnection & Transformers
The multi-year queue between a finished building and its first watt.
Estás viendo un registro de tecnología: un bloque fundamental del hardware de IA, qué hace, quién la fabrica y qué chips y sistemas la utilizan.
Connecting a campus means substations, switchgear and large power transformers — equipment with lead times that stretched to 3–5 years — plus an interconnection study queue that in ERCOT and PJM contains hundreds of gigawatts of requested data-center load. This unglamorous layer, more than chips, sets the pace of the build-out.