{"data":{"slug":"grid-transformers","etype":"tech","name":"Grid Interconnection & Transformers","cat":"Power","subtitle":"The multi-year queue between a finished building and its first watt.","summary":"Connecting a campus means substations, switchgear and large power transformers (equipment with lead times that stretched to 3–5 years) plus an interconnection study queue that in ERCOT and PJM contains hundreds of gigawatts of requested data-center load. This unglamorous layer, more than chips, sets the pace of the build-out.","attrs":null,"kf":null,"aliases":["transformers","substation","interconnection queue","grid"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":null,"region":null,"asof":"2026-01-15","sources":[{"url":"https://emp.lbl.gov/queues","label":"LBNL interconnection queue research"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-11-28T07:30:14+00:00","disclaimer":"Research and information only, not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}