Grid Interconnection & Transformers
The multi-year queue between a finished building and its first watt.
You're looking at a technology record: a building block of AI hardware, what it does, who makes it, and which chips and systems use it.
Connecting a campus means substations, switchgear and large power transformers (equipment with lead times that stretched to 3–5 years) plus an interconnection study queue that in ERCOT and PJM contains hundreds of gigawatts of requested data-center load. This unglamorous layer, more than chips, sets the pace of the build-out.