{"data":{"slug":"palisades","etype":"power","name":"Palisades Nuclear Plant","cat":"Nuclear Restart","subtitle":"The first US reactor licensed back from decommissioning, still working toward power.","summary":"Holtec bought Palisades (800 MW), shut in May 2022, to decommission it, then pursued a restart with Michigan support and a $1.52B DOE loan guarantee. In July 2025 the NRC approved the licensing actions returning it to operational status, the first for a US plant in decommissioning. The restart, first aimed at late 2025, has slipped: fuel loading began 30 August 2026 but paused when an assembly tilted in the core; Holtec recovered it in October 2026 and resumed loading. The plant is contracted to supply power from March 2027, and Holtec has not published a firm restart date.","attrs":[{"b":"Official","g":"Overview","l":"Owner","v":"Holtec International"},{"b":"Official","g":"Overview","l":"Capacity","u":"MW","v":"800"},{"b":"Reported","g":"Overview","l":"Shutdown","n":"Nuclear Engineering International, Oct 2026","v":"May 2022 (defueled June 2022)"},{"b":"Official","g":"Overview","l":"Financing","v":"$1.52B DOE loan guarantee (finalised Sep 2024) + state support"},{"b":"Official","g":"Regulatory","l":"NRC return to operations","n":"NRC release 25-046; Holtec, Aug 2025","v":"Licensing actions approved 24 Jul 2025; plant formally transitioned to operational status 25 Aug 2025"},{"b":"Official","g":"Schedule","l":"Fuel loading","n":"Holtec release, 21 Oct 2026; ANS, Sep 2026","v":"Began 30 Aug 2026; paused after a fuel assembly tilted; assembly recovered with NRC-approved method and loading resumed (21 Oct 2026)"},{"b":"Reported","g":"Grid","l":"Switchyard","n":"ANS Nuclear Newswire, 25 Sep 2026","v":"Reconnected to 345 kV switchyard 11 Sep 2026"},{"b":"Reported","g":"Schedule","l":"Restart target","n":"Nuclear Engineering International, 26 Oct 2026","v":"Contracted to supply power by March 2027; no firm date published"},{"b":"Reported","g":"Regulatory","l":"NRC inspection finding","n":"ANS, Oct 2026","v":"Chilled work environment found in supply chain and QA departments (Oct 2026)"}],"kf":{"type":"Nuclear restart","status":"Fuel loading resumed Oct 2026; not yet generating (Nov 2026)","capacity":"800 MW"},"aliases":["Palisades restart"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":"Restart under way; fuel loading","region":"Covert Township, Michigan, US","asof":"2026-11-16","sources":[{"url":"https://holtecinternational.com/hh-41-24/","label":"Holtec: tilted fuel assembly recovered at Palisades (Oct 2026)"},{"url":"https://www.neimagazine.com/news/palisades-resolves-fuel-assembly-setback/","label":"NEI Magazine: Palisades resolves fuel assembly setback (Oct 2026)"},{"url":"https://www.ans.org/news/article-8436/incident-pauses-palisades-fuel-loading-plant-connected-to-switchyard/","label":"ANS: Incident pauses Palisades fuel loading (Sep 2026)"},{"url":"https://www.ans.org/news/2025-07-28/article-7237/palisades-gets-a-key-green-light-from-nrc","label":"ANS: Palisades gets a key green light from NRC (Jul 2025)"},{"url":"https://holtecinternational.com/products-and-services/palisades/","label":"Holtec Palisades"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-11-28T08:03:15+00:00","disclaimer":"Research and information only, not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}