Kairos Hermes / Google Fleet
电力项目
SMR计划
Under construction (demo)
Oak Ridge, Tennessee, US
The first Gen IV construction permits in the US — and Google's 500 MW order.
您正在查看一条电力记录:一个真实的发电站或能源协议——谁拥有它,它为哪家 AI 买家供电。
Kairos Power's Hermes demonstration reactors at Oak Ridge hold the US NRC's first construction permits for a Generation IV design (fluoride-salt-cooled). Google's October 2024 master agreement — up to 500 MW across a fleet, first unit targeted ~2030 — was the first corporate order book for SMRs, TVA purchasing Hermes 2 output.
规格与关键参数
每个数据均标注来源依据:厂商规格、厂商声明、公开报道、估算或官方数据。"未公开披露"即字面含义——我们从不捏造数值。
Overview
Developer
Kairos PowerOfficial
Milestone
First US Gen IV construction permits (2023–24)Official
Google agreement
Up to 500 MW by 2035, first ~2030Official