Fairwater Atlanta is the second site in Microsoft's Fairwater family and the first to enter service, beginning operation in October 2025. It uses the same design as the Wisconsin site in a two-story building, with NVIDIA GB200 NVL72 racks and closed-loop liquid cooling. A dedicated AI WAN links it to Wisconsin so the sites can work as one 'AI superfactory'. Epoch AI places it in Fayetteville, Georgia, built by QTS, and estimates about 636 MW of IT power was operating by June 2026.
Especificações e dados principais
Cada valor é classificado pela sua base: especificação do fabricante, declaração do fabricante, reportado, estimativa ou oficial. "Não divulgado publicamente" significa exatamente isso: nunca inventamos valores.
Overview
Scale
Resfriamento
Como isso se conecta ao restante da pilha
Os links deste registro em resumo: clique em um grupo para ir até ele.
Resfriamento
Contém
Operado por
Desenvolvido por
Relacionado
Fontes
Microsoft: AI superfactory, Wisconsin to Atlanta (Nov 2025) ↗ · Epoch AI: Fairwater Atlanta (estimates) ↗
Registro revisado em 2026-11-16; ver Metodologia.