Microsoft Fairwater Atlanta
The first Fairwater to switch on, and the second node of Microsoft's AI superfactory.
U bekijkt een data-centerrecord: een bestaande faciliteit, wie die beheert, welke hardware erin staat en waar de stroom vandaan komt.
Fairwater Atlanta is the second site in Microsoft's Fairwater family and the first to enter service, beginning operation in October 2025. It uses the same design as the Wisconsin site in a two-story building, with NVIDIA GB200 NVL72 racks and closed-loop liquid cooling. A dedicated AI WAN links it to Wisconsin so the sites can work as one 'AI superfactory'. Epoch AI places it in Fayetteville, Georgia, built by QTS, and estimates about 636 MW of IT power was operating by June 2026.
Specificaties & kernfeiten
Elk cijfer is voorzien van een bronlabel: vendor spec, vendor claim, reported, estimate of official. "Not publicly disclosed" betekent precies dat: wij verzinnen nooit waarden.
Overview
Scale
Koeling
Hoe dit verbindt met de rest van de stack
De links van dit record in één oogopslag: klik op een groep om er naartoe te springen.
Koeling
Beheerd door
Gebouwd door
Gerelateerd
Bronnen
Microsoft: AI superfactory, Wisconsin to Atlanta (Nov 2025) ↗ · Epoch AI: Fairwater Atlanta (estimates) ↗
Record beoordeeld per 2026-11-16; zie Methodologie.