Microsoft Fairwater Atlanta
The first Fairwater to switch on, and the second node of Microsoft's AI superfactory.
Vous consultez une fiche data center : une installation réelle, qui la gère, quel matériel la remplit et d'où provient son alimentation électrique.
Fairwater Atlanta is the second site in Microsoft's Fairwater family and the first to enter service, beginning operation in October 2025. It uses the same design as the Wisconsin site in a two-story building, with NVIDIA GB200 NVL72 racks and closed-loop liquid cooling. A dedicated AI WAN links it to Wisconsin so the sites can work as one 'AI superfactory'. Epoch AI places it in Fayetteville, Georgia, built by QTS, and estimates about 636 MW of IT power was operating by June 2026.
Spécifications et faits clés
Chaque chiffre est accompagné de sa base : spécification fabricant, déclaration fabricant, valeur rapportée, estimation ou officielle. « Non divulgué publiquement » signifie exactement cela : nous n'inventons jamais de valeurs.
Overview
Scale
Refroidissement
Comment cela s'articule avec le reste de la pile
Les liens de cette fiche en un coup d'œil : cliquez sur un groupe pour y accéder.
Refroidissement
Contient
Exploité par
Construit par
Associé
Sources
Microsoft: AI superfactory, Wisconsin to Atlanta (Nov 2025) ↗ · Epoch AI: Fairwater Atlanta (estimates) ↗
Fiche vérifiée au 2026-11-16; voir Méthodologie.