Fairwater Atlanta is the second site in Microsoft's Fairwater family and the first to enter service, beginning operation in October 2025. It uses the same design as the Wisconsin site in a two-story building, with NVIDIA GB200 NVL72 racks and closed-loop liquid cooling. A dedicated AI WAN links it to Wisconsin so the sites can work as one 'AI superfactory'. Epoch AI places it in Fayetteville, Georgia, built by QTS, and estimates about 636 MW of IT power was operating by June 2026.
Especificaciones y datos clave
Cada cifra está etiquetada según su base: especificación del fabricante, declaración del fabricante, dato publicado, estimación u oficial. "No divulgado públicamente" significa exactamente eso: nunca inventamos valores.
Overview
Scale
Refrigeración
Cómo esto se conecta con el resto del stack
Los enlaces de este registro de un vistazo: haga clic en un grupo para ir directamente a él.
Refrigeración
Contiene
Operado por
Construido por
Relacionado
Fuentes
Microsoft: AI superfactory, Wisconsin to Atlanta (Nov 2025) ↗ · Epoch AI: Fairwater Atlanta (estimates) ↗
Registro revisado a fecha de 2026-11-16; ver Metodología.