Cluster Power Calculator
Estimate the electrical footprint of a GPU cluster: pick a chip, set the count, and see IT load, facility load and an illustrative energy bill. Arithmetic only — every assumption is yours to change.
Worked example
1,024 × NVIDIA H100 (700 W vendor spec), +60% host overhead, PUE 1.50, 70% utilization, $0.08/kWh: IT load ≈ 1.15 MW; facility load ≈ 1.72 MW; energy ≈ 879 MWh/month; illustrative bill ≈ $70,000/month. A 100,000-GPU campus at the same assumptions lands near 168 MW — utility scale, which is why the Power section of this database exists.
All outputs are arithmetic on your inputs plus vendor-spec TDP; real deployments vary with workload, binning, cooling and tariffs. Research and education only.