{"data":{"slug":"xai-colossus-2","etype":"datacenter","name":"xAI Colossus 2","cat":"AI Campus","subtitle":"The gigawatt sequel: xAI's push toward a million-GPU class site.","summary":"xAI's second Memphis-area campus pairs a new data hall complex with a dedicated power build-out (including generation across the state line in Mississippi). Musk has stated ambitions of a million GPUs across the Colossus program; first GB200/GB300 capacity came up in 2025. Figures are company statements and reporting, not audited totals.","attrs":[{"g":"Overview","l":"Operator","v":"xAI"},{"b":"Vendor claim","g":"Scale","l":"Plan","v":"Gigawatt-class campus; million-GPU ambition across sites"},{"b":"Reported","g":"Power","l":"Supply","v":"Dedicated turbines + grid; Solaris power JV reported"}],"kf":{"chips":"GB200/GB300 class","power":"~1+ GW planned (reported)","status":"Ramping 2025–26","operator":"xAI"},"aliases":["Colossus 2"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":"Under construction","region":"Memphis, Tennessee, US","asof":"2026-01-15","sources":[{"url":"https://x.ai/","label":"xAI"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-10-14T05:47:32+00:00","disclaimer":"Research and information only — not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}