{"data":{"slug":"xai-colossus-2","etype":"datacenter","name":"xAI Colossus 2","cat":"AI Campus","subtitle":"The gigawatt sequel: xAI's second Memphis campus, powered from across the Mississippi line.","summary":"Colossus 2 is xAI's second Memphis-area campus, owned by SpaceX since its February 2026 acquisition of xAI. SpaceX's IPO filing describes a first cluster of about 110,000 GB200 processors (about 210 MW) and a second of 110,000 GB300 (220 MW), with a further phase of 400+ MW planned. Epoch AI estimated about 946 MW of IT power as of June 2026. Power comes largely from gas turbines at Southaven, Mississippi, where a 41-turbine permit was issued in March 2026 and a Clean Air Act suit over unpermitted units is proceeding.","attrs":[{"b":"Official","g":"Overview","l":"Operator","v":"xAI, a SpaceX subsidiary since Feb 2026"},{"b":"Official","g":"Scale","l":"Cluster 1","n":"SpaceX Form S-1","v":"~110,000 GB200, ~210 MW compute power"},{"b":"Official","g":"Scale","l":"Cluster 2","n":"SpaceX Form S-1","v":"110,000 GB300, 220 MW compute power"},{"b":"Official","g":"Scale","l":"Next phase","n":"SpaceX Form S-1","v":"220,000+ additional GB300, 400+ MW (planned)"},{"b":"Estimate","g":"Scale","l":"Estimated IT power","n":"Epoch AI, as of 15 Jun 2026; Epoch projects ~1.5 GW by about Feb 2027","u":"MW","v":"946"},{"b":"Reported","g":"Power","l":"Supply","n":"Mississippi Free Press, Nov 2026; SpaceX says unpermitted units retire by Jul 2027","v":"Gas turbines at Southaven, MS (41 permanent units permitted Mar 2026; up to 69 run under a temporary exemption) + batteries + grid"},{"b":"Reported","g":"Overview","l":"Litigation","v":"NAACP Clean Air Act suit over Southaven turbines; motion to dismiss denied 30 Oct 2026"}],"kf":{"chips":"NVIDIA GB200 + GB300","power":"~946 MW IT (Epoch estimate, Jun 2026)","status":"Operating; expanding","operator":"xAI (SpaceX)"},"aliases":["Colossus 2","Colossus II"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":"Operating; expanding","region":"Memphis, Tennessee, US","asof":"2026-11-16","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001181412/000162828026036936/spaceexplorationtechnologi.htm","label":"SpaceX Form S-1 (Colossus II clusters)"},{"url":"https://epoch.ai/data/ai-data-centers/directory/colossus-2","label":"Epoch AI: Colossus 2 (estimates)"},{"url":"https://mississippifreepress.org/mississippi-court-rejects-spacexs-bid-to-throw-out-suit-alleging-clean-air-act-violations-in-southaven/","label":"Mississippi Free Press: court rejects bid to dismiss Southaven suit"},{"url":"https://www.selc.org/press-releases/mississippi-regulators-rubber-stamp-air-permit-for-xai-power-plant-ignoring-overwhelming-public-pushback/","label":"SELC: MDEQ issues Southaven turbine permit"},{"url":"https://x.ai/","label":"xAI"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-11-29T09:21:18+00:00","disclaimer":"Research and information only, not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}