{"data":{"slug":"stargate-us-sites","etype":"datacenter","name":"Stargate US sites","cat":"AI Campus","subtitle":"Six campuses beyond Abilene meant to carry Stargate toward 7 GW.","summary":"In September and October 2025 OpenAI, Oracle and SoftBank named six US campuses beyond Abilene, which they said would bring Stargate to nearly 7 GW of planned capacity. Oracle leads four, built by developers: Vantage in Shackelford County, Texas (1.4 GW) and Port Washington, Wisconsin (close to 1 GW), STACK's Project Jupiter in Doña Ana County, New Mexico, and Related Digital in Saline Township, Michigan (over 1 GW). SoftBank leads Lordstown, Ohio and Milam County, Texas, where SB Energy is building a 1.2 GW campus. In September 2026 Oracle said none of its four had yet been delivered.","attrs":[{"b":"Official","g":"Overview","l":"Program","v":"Stargate: OpenAI, Oracle, SoftBank"},{"b":"Official","g":"Overview","l":"Announced","v":"23 Sep 2025 (five sites); Wisconsin 22 Oct 2025; Michigan 30 Oct 2025"},{"b":"Official","g":"Scale","l":"Program plan","n":"OpenAI, 23 Sep 2025","v":"Nearly 7 GW incl. Abilene; $400B+ over three years"},{"b":"Official","g":"Sites","l":"Shackelford County, TX","n":"Vantage; Oracle Q1 FY2027 call, 10 Sep 2026","v":"Vantage for Oracle/OpenAI; 1.4 GW, 10 buildings, $25B+; not yet delivered (Sep 2026)"},{"b":"Reported","g":"Sites","l":"Doña Ana County, NM","n":"Capacity not stated by OpenAI","v":"Project Jupiter: STACK Infrastructure / BorderPlex, Oracle tenant; first building topped out; air permit in progress (Sep 2026)"},{"b":"Official","g":"Sites","l":"Milam County, TX","v":"SB Energy builds and operates; OpenAI 1.2 GW lease; SoftBank and OpenAI each invested $500M in SB Energy (Jan 2026)"},{"b":"Official","g":"Sites","l":"Lordstown, OH","v":"SoftBank; with Milam, 'up to 1.5 GW within 18 months' (Sep 2025); no delivery disclosed"},{"b":"Reported","g":"Sites","l":"Port Washington, WI","v":"Vantage for Oracle/OpenAI; four buildings, close to 1 GW, $15B+; completion 2028"},{"b":"Reported","g":"Sites","l":"Saline Township, MI","n":"Construction from ~Mar 2026 after a township lawsuit settlement","v":"Related Digital for Oracle/OpenAI; more than 1 GW, three buildings; delivery targeted end of 2027"},{"b":"Official","g":"Overview","l":"Delivery status","n":"Oracle Q1 FY2027 earnings call, 10 Sep 2026","v":"Oracle: none of Shackelford, New Mexico, Wisconsin or Michigan delivered as of Sep 2026"}],"kf":{"power":"~7 GW Stargate plan incl. Abilene (Sep 2025)","status":"All under construction (Nov 2026)","operator":"Oracle; SoftBank / SB Energy (for OpenAI)"},"aliases":["Stargate sites","Stargate Shackelford","Project Jupiter","Stargate Michigan","Stargate Wisconsin","Stargate Milam County"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":"Under construction","region":"Texas, New Mexico, Ohio, Wisconsin, Michigan, US","asof":"2026-11-16","sources":[{"url":"https://www.fool.com/earnings/call-transcripts/2026/09/11/oracle-orcl-q1-2027-earnings-call-transcript/","label":"Oracle Q1 FY2027 earnings call transcript (Sep 2026)"},{"url":"https://www.cnbc.com/2026/06/01/stargate-project-michigan-live-updates.html","label":"CNBC: Stargate Michigan groundbreaking (Jun 2026)"},{"url":"https://openai.com/index/stargate-sb-energy-partnership/","label":"OpenAI: Stargate partnership with SB Energy (Jan 2026)"},{"url":"https://epochai.substack.com/p/openai-stargate-where-the-us-sites","label":"Epoch AI: where the US Stargate sites stand"},{"url":"https://www.datacenterdynamics.com/en/news/first-building-at-project-jupiter-data-center-campus-in-new-mexico-topped-out/","label":"DCD: first Project Jupiter building topped out"},{"url":"https://openai.com/index/expanding-stargate-to-michigan/","label":"OpenAI: expanding Stargate to Michigan (Oct 2025)"},{"url":"https://siliconangle.com/2025/10/23/openai-oracle-vantage-build-15b-data-center-campus-wisconsin","label":"SiliconANGLE: Stargate Port Washington, Wisconsin (Oct 2025)"},{"url":"https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx","label":"Vantage: Shackelford County campus"},{"url":"https://openai.com/index/five-new-stargate-sites/","label":"OpenAI: five new Stargate sites (Sep 2025)"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-11-16T22:03:32+00:00","disclaimer":"Research and information only, not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}