{"data":{"slug":"microsoft-fairwater","etype":"datacenter","name":"Microsoft Fairwater","cat":"AI Campus","subtitle":"Microsoft's 'most powerful AI datacenter', and a template it is replicating.","summary":"Fairwater in Mount Pleasant, Wisconsin, on land once planned for Foxconn's LCD plant, is the site Microsoft called the world's most powerful AI datacenter when it announced it in September 2025: hundreds of thousands of GB200-class GPUs on a flat network with closed-loop liquid cooling. Microsoft said the first building was going live in April 2026 and was fully operational on 23 June 2026; a second facility is due in 2028. Epoch AI estimates about 369 MW of IT power in the first building. A dedicated AI WAN links it to Fairwater Atlanta as one 'AI superfactory'.","attrs":[{"g":"Overview","l":"Operator","v":"Microsoft (Azure)"},{"b":"Official","g":"Overview","l":"Announced","v":"September 2025"},{"b":"Official","g":"Overview","l":"Operational","n":"Satya Nadella on X, 16 Apr 2026; Microsoft release, 23 Jun 2026","v":"Going live Apr 2026; fully operational 23 Jun 2026"},{"b":"Official","g":"Overview","l":"Second facility","v":"Scheduled for completion in 2028"},{"b":"Vendor claim","g":"Scale","l":"Hardware","v":"'Hundreds of thousands' of GB200-class GPUs (company statements)"},{"b":"Estimate","g":"Scale","l":"Estimated IT power","n":"Epoch AI, building 1 operational from Apr 2026","u":"MW","v":"369"},{"b":"Official","g":"Overview","l":"Local construction spend","n":"Microsoft release, 23 Jun 2026","v":"$4.7B on hyperscale construction, 2024–2028"},{"b":"Vendor claim","g":"Cooling","l":"Cooling","v":"Closed-loop liquid; company says near-zero operational water for cooling"},{"b":"Official","g":"Overview","l":"Replication","v":"Fairwater Atlanta (operating since Oct 2025); sites linked by an AI WAN on 120,000 mi of dedicated fiber"}],"kf":{"chips":"NVIDIA GB200 fleet","power":"~369 MW IT, building 1 (Epoch estimate)","status":"Building 1 fully operational Jun 2026; building 2 due 2028","operator":"Microsoft"},"aliases":["Fairwater","Fairwater Wisconsin","Mount Pleasant data center"],"ticker":null,"exchange":null,"hq":null,"founded":null,"website":null,"status":"Operating; expanding","region":"Mount Pleasant, Wisconsin, US","asof":"2026-11-16","sources":[{"url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","label":"Microsoft: first Mount Pleasant facility complete (Jun 2026)"},{"url":"https://x.com/satyanadella/status/2044767391293509761","label":"Satya Nadella: Fairwater going live (Apr 2026)"},{"url":"https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/","label":"Microsoft: AI superfactory, Wisconsin to Atlanta (Nov 2025)"},{"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin","label":"Epoch AI: Fairwater Wisconsin (estimates)"},{"url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/","label":"Microsoft Fairwater announcement"}]},"meta":{"found":true,"count":1,"served_from":"site cache (no live upstream calls)","as_of":"2026-11-28T08:03:40+00:00","disclaimer":"Research and information only, not investment advice. Structured records carry basis labels (vendor spec / reported / estimate); market quotes are delayed/indicative.","attribution":"Records compiled from vendor documentation, official filings and reputable public reporting; market quotes via financial data providers. See /data-sources."}}